wood preservation equipment installation specification |
Paint Drying Machine |
|
Product Introduction:
Wood treatment plant
Wood treatment equipment include the wood preservation ,wood flame-resistant, wood dyeing as so on. It is designed according to international standard design.
We have three ways to treat wood . One is full-cell process ,the other high and low frequency pressure, the last one is double vacuum
The equipment pressure is -0.08Mpa-3.6Mpa
The temperature is 200 centigrade
The vacuum degree (relative) 0.098Mpa
One time can treat 2m3-20m3
1??????????????????timber preservation and flame retardant equipment operation procedure
1.1????????????????????????????????????????????????????????????????????????????????????????????????????????????й?????According to different varieties trees to divided into full-cell method ,and half quantitative method.Now we will especially focused on full-cell method.If user want to use other method also can for other reference standard.
1.2?????????????????????????????Σ???????????????????????????????????????????????????????????????Full-cell method timber preservation and fired retardant is divided into ten steps. Closed tank door -initial vacuum -imbibition -air balance -inflating- liquor drainage-final vacuum-restore atmosphere-discharge the rest liquor-open tank door
1.3??????????????????????????????????????????y?????????Σ?
Before official anticorrosive and flame retardant ,it's sure that everything is satisfied ,or it's prohibit to produce.
1.1.1??????????????????????????????????????????
There is enough qualified antiseptic (fired retardant)
1.1.2???????????????????????????????????????????????????????磬??????????????????????
Ensure that The hermetic seal of timber preservation equipment is well:there is no impurity around the surface of seal :the door open easily,safety interlocking device work in regular.
1.1.3?????????????漲??????????????????????
The pressure gauge and vacuum gauge comply with requirement ,which show pressure and vacuum degree.
1.1.4??????????????й???????????????????
The seal of valve is well ,no leaks,safety valve can open normally.
1.1.5??????????????豸????????????
The pump equipment can work in regular.
1.1.6????????????????????С???????????
The qualified loaded on production trolley wood for production
1.1.7????????????????Electric control system is well
1.4 ????? closed tank door
?????????С??????????????????????????????????????ù???????豸???????????綯????????????????????????????????漲λ????????棺?????????????????????κ???????e????????????????Push loaded wood trolley into timer preservation tank ,push away traverse table,closed tank door in the right way(start the tank door by electric way ,it's accepted that press the open button to adjust the tank door to
assigned position )Alarm:After you closed tank door and enter into initial vacuum process ,it's prohibit to press open button at anytime .
1.5 ???? initial vacuum
1.5.1 ??????????????????????????????????????????????????????????·???????????????????·??????V1??V2??????????????????????? After close the tank door ,then can go on operate initial vacuum :first check the valve status of process piping connect to timber preservation equipment,except that the valve of vacuum line (??V1??V2??is open,the other valve is off!
???????豸???????
Wood preservation equipment maintenance
1. To daub regula butter in the turbine ,screw ,bearing which are tank opening device at the fixed time,,keep oil state
1???????????????????????????????????????????????
2.To keep clean of the tank sealing ring ,the contact surface,before shut the door ,so should be with mechanical lubricating oil on seal ring and cans incisors surface ,keep sealing and cans door switch freely
2?????????????漰??????????????????????????????е???????????????????棬????????????????????硣
3.To daub mechanical lubrication oil on the valves and screw in order to avoid jamming pipeline and pump body.
3????????????????????е??????????????????????塣
4.To clean bits of wood or any other impurities inside stainless steel filter and pressure tank.
4??????????????????????????????м????????????????????????塣
5.To keep water in vacuum pump cooling water tank ,it is strictly prohibited to open pump without water,and to clean water tank,keep the water clean inside of water tank.
5?????????????????????????????????????????????????????????????????
6.Before opening pressure pump,need to confirm if the valve is open between liquid storing box and pressure pump (liquid storing have enough potions).it is strictly prohibited to open pump without liquid.
6?????????????????????????????????????????????????????????????
7.To inspect the relief every year and inspect pressure gauge every six months
7?????????????????????У????Ρ?
??
????????????????
Common faults and elimination methods
????????
Fault phenomenon
???????
Possible cause
???????
????????????
Boost slowly or not boost
1?????????????????????????????????
Filter (or bottom valve )is at the front of pressure pump which is blocked
2??????????????????????????
Loaded wood is too high ,block pressure pipe mouth
3???????·??????
Pressure pipe is blocked
1?????????????????????????
Uppick and wash the mesh of the filter (or bottom valve)
2????????????????????????????????10???????????????????????
Reduce the load wood height ,assure at least 10cm gap between the top of wood and tank deck
3????·?????
Clean the pipe
?????????????????ò??????
After closed the door ,the vacuum pump cann't start
??????????????г??δ????????δ???????????????????
The door of open device downstroke failed to close ,cann't give control cabinet a closed signal
????????????г???????
Adjust the contact to close the downstroke
??????????????????
After manufacture ,the door cann't be opened
????????????????????δ????????λ???????
The contact pressure gauge pointer to zero which don't contact the lowest limit pointer
?????????????????λ??????????????????????????ɡ?
When the pressure gauge is zero ,adjust lowest limit pointer a little to make working pointer contact |
|
|
|
|
|
|